| Construction Status February 2010 |
| |
 |
 |
 |
Block 1 South Side Terrace
Screeding Works |
Block 2 South Side Elevatoin |
Block 2 North Side Elevation |
|
|
|
 |
 |
|
| STP Staircase Headroom Works |
UG Sump Top Slab
Shuttering Works |
|
| |
|
|
|
| |
| Construction Status January 2010 |
| |
 |
 |
 |
| Block 1 Elevation |
Block 2 Elevation |
Block 3 Elevation |
|
|
|
 |
 |
 |
| Block 4 Elevation |
STP Works |
UG Sump Works |
|
|
|
|
| |
| Construction Status December 2009 |
| |
 |
 |
 |
| North Elevation |
South Elevation |
View Of Block 4 |
|
|
|
 |
 |
 |
| View Of Block 1 |
STP Top Slab Works In Progress |
UG Sump Excavation Completed |
|
|
|
|
| |
| Construction Status November 2009 |
| |
 |
 |
 |
| North Elevation |
South Elevation |
East Elevation |
| |
|
|
 |
 |
 |
| West Elevation |
STP |
Living Room |
| |
|
|
 |
 |
 |
| Living Room |
Dining Hall |
Dining Hall |
| |
|
|
 |
 |
 |
| Dining Hall |
Kitchen |
Kitchen |
| |
|
|
 |
 |
 |
| Bed Room |
Bedroom |
Bedroom |
| |
|
|
 |
 |
|
| Toilet |
Toilet |
|
|
| |
| |
| Construction Status October 2009 |
| |
 |
 |
 |
| Block 1,2,3,4 North Elevation |
Block 1,2,3,4 South Elevation |
Block 4 East Elevation |
|
|
|
 |
 |
|
| Block 1 West Elevation |
STP |
|
|
|
|
|
| |
| |
| |